Hauling and blocking went uneventfully. I have to winterize the engine (water system has already been done) and plan on detailing the hull and giving the deck a thorough washing before I wrap O'Sea D for the winter.
My folding bike gets used twice a year |
Thayer's Landing - only 3 boats left |
Just starting to get lifted out of the water |
Trailer had to be repositioned, so I tied off for a few mins |
Other boats already stored for the winter |
Port side has been powerwashed |
No comments:
Post a Comment